DURABILITY CASE STUDIES
TREADX DURABILITY CASE STUDIES
Download TREADX Durability Case Studies
CASE STUDY #1
Project: Willis (Sears) Tower - Chicago, Illinois
Duration: 5 Months
TREADX™ Model: TREADX FR SP175 Sanitary Cove
TREADX removed for TREADX Buy-Back Recycling Program™.
TREADX was very dirty with drywall mud, dirt and debris yet the non-skid surface was just as effective when first installed and after cleaning the TREADX they looked just like they did when first installed as well.
After 5 months of heavy use, there were NO damages to any of the stair pans or risers And there was NO wear of damage to the TREADX either.
The New Standard in Job-Site Stair Safety
CASE STUDY #2
Project: Private School & Community Center – Detroit, MI
Duration: 10 Months
TREADX™ Model: TREADX FR SP15
After 10 months of heavy use, TREADX is covered with mud, dirt and debris but there were NO damages to any of the stair pans or risers and NO wear or damage to the TREADX either.
The New Standard in Job-Site Stair Safety